Loading From Positions Above Ground
Level

Before loading weight to platform above ground level:

1.

Determine what the total rated capacity weight
will be after additional weight is loaded (per-
sonnel, tools and supplies).

2. If total weight in platform will be less then rated

capacity, proceed with adding weight.

Platform Level Adjustment

1.

Leveling UP. Depress footswitch to raise plat-
form, position PLATFORM LEVEL control
switch UP and hold until platform is level.

2.

Leveling DOWN. Depress footswitch to lower
platform, position PLATFORM LEVEL control
switch to DOWN and hold until platform is
level.

Platform Rotation

1.

Depress footswitch to rotate platform to the left,
PLATFORM ROTATE control is positioned

to the

LEFT and held until desired position is reached.

2.

Depress footswitch to rotate platform to the
right, PLATFORM ROTATE control is posi-
tioned to the RIGHT and held until desired
position is reached.