9 shut down and park, 10 lifting and tie down, Lifting – JLG E300 Operator Manual User Manual

Page 56: Tie down, Shut down and park -10, 10 lifting and tie down -10, Lifting -10 tie down -10, 10 lifting and tie down lifting

Advertising
background image

SECTION 4 - MACHINE OPERATION

4-10

– JLG Lift –

3121214

4.9

SHUT DOWN AND PARK

NOTE:

When parking battery powered units overnight, batteries
should be charged in accordance with instructions in
Section 6 to ensure readiness for following workday.

NOTE:

Electric machines are equipped with a static strap due to
static electricity build-ups. Strap is located under rear of
machine chassis.

To shut down and park the machine, the procedures are as
follows:

1. Drive machine to a reasonably well protected area.

2. Ensure boom is lowered over rear drive axle.

3. Shut down Emergency Stop at Platform Controls.

4. Shut down Emergency Stop at Ground Controls. Posi-

tion Platform/Ground Select switch to center OFF.

5. If necessary, cover Platform Controls to protect instruc-

tion placards, warning decals and operating controls
from hostile environment.

4.10 LIFTING AND TIE DOWN

Lifting

1. Refer to the Serial Number Tag, call JLG Industries, or

weigh the individual unit to find out the Gross Vehicle
Weight.

2. Place the boom in the stowed position.

3. Remove all loose items from the machine.

4. Properly adjust the rigging to prevent damage to the

machine and so the machine remains level.

Tie Down

WHEN TRANSPORTING THE MACHINE, THE BOOM MUST BE FULLY
LOWERED INTO THE BOOM REST.

1. Place the boom in the stowed position.

2. Remove all loose items from the machine.

3. Secure the chassis and the platform using straps or

chains of adequate strength.

Advertising