Cab and Covers

4-12

G6-42A,G9-43A, G10-43A

19. Open Cab: Route a sling with a minimum lifting

capacity of 1000 lbs (453 kg) under the inner four
braces (14) and behind the center cross support
above the wind shield or install two lifting eye bolts
(15) in the threaded holes on the roof of the cab
above the B pillars (16).

20. Enclosed Cab: Install two lifting eye bolts (14) in the

threaded holes on the roof of the cab above the B
pillars (16). Route a sling with a minimum lifting
capacity of 1000 lbs (453 kg) through the lifting eye
bolts.

21. Remove the two cab side-mount bolts in the cab

(17).

22. Remove the four cab-to-frame bolts, flat washers and

nuts (18).

23. Remove the mirrors and all other cab components

as needed, if not previously removed.

24. Carefully begin to lift the cab. Stop and check that all

wiring, hydraulic hoses and fasteners are
disconnected or removed.

25. When all wiring, hydraulic hoses and fasteners are

disconnected or removed, carefully and slowly lift
the cab and remove it from the frame. Readjust the
position of the sling as needed to help balance the
cab during removal.

26. When the cab is completely clear of the machine,

carefully lower it to the ground. Block up or support
the cab so that it does not move or fall. Assure that
no personnel enter the cab while it is being removed
from the machine.

27. Inspect the condition of the fittings, clamps,

hydraulic hoses, etc. Replace parts as indicated by
their condition.

28. Inspect and replace other machine parts that are

exposed with the cab removed. Repair or replace as
required.

4.5

CAB INSTALLATION

1. Block all four wheels to help prevent the machine

from moving. Assure that there is sufficient overhead
and side clearance for cab installation.

2. Open Cab: Route a sling with a minimum lifting

capacity of 1000 lbs (453 kg) under the inner four
braces (14) and behind the center cross support
above the wind shield or install two lifting eye bolts
(15) in the threaded holes on the roof of the cab
above the B pillars (16).

3. Enclosed Cab: Install two lifting eye bolts (14) in the

threaded holes on the roof of the cab above the B
pillars (16). Route a sling with a minimum lifting
capacity of 1000 lbs (453 kg) through the lifting eye
bolts.

MY0610

14

15

16

MY4170

18

17

17

18

MY0610

14

15

16