JLG 110HX ANSI Service Manual User Manual

Page 118

Advertising
background image

SECTION 2 - PROCEDURES

2-94

– JLG Lift –

3120636

JLG Industries requires that a complete annual inspection
be performed in accordance with the "Annual Machine
Inspection Report" form. Forms are supplied with each
new machine and are also available from JLG Customer
Service. Forms must be completed and returned to JLG
Industries.

JLG INDUSTRIES REQUIRES THAT A COMPLETE ANNUAL
INSPECTION BE PERFORMED IN ACCORDANCE WITH THE
"ANNUAL MACHINE INSPECTION REPORT" FORM.

This machine requires periodic safety and maintenance
inspections by a JLG Dealer. A decal located on the turn-
table affords a place to record (stamp) inspection dates.
Notify dealer if inspection is overdue.

The inspection and maintenance code numbers are as fol-
lows:

1.

Check for proper and secure installation.

2.

Check for visible damage and legibility.

3.

Check for proper fluid level.

4.

Check for any structural damage; cracked or broken
welds; bent or warped surfaces.

5.

Check for leakage.

6.

Check for presence of excessive dirt or foreign
material.

7.

Check for proper operation and freedom of move-
ment.

8.

Check for excessive wear or damage.

9.

Check for proper tightness and adjustment.

10.

Drain, clean and refill.

11.

Check for proper operation while engine is running.

12.

Check for proper lubrication.

13.

Check for evidence of scratches, nicks or rust and
for straightness of rod.

14.

Check for condition of element; replace as neces-
sary.

15.

Check for proper inflation.

16.

Clean or replace suction screen.

17.

Drain and clean.

* Inspection and Maintenance Code 10, 12 and 16 to be
performed every two years.

** Inspection and Maintenance Code 8 to be performed
every two years.

*** Axle lockout test to be performed quarterly.

Table 2-7.Preventive Maintenance and Inspection Schedule

AREA

DAILY

WEEKLY

INTERVAL

MONTHLY

3 MONTH

6 MONTH

YEARLY

BOOM

1.

Platform

1,4

12

2.

Platform Gate

1,4

12

3.

Platform Rotator

5,11

8,12

4.

Footswitch

1,11

5.

Controllers

1,11

6.

Switches

1,11

7.

Placards and Decals

1,2

8.

Control Tags

1,2

9.

Valves

5,6

10.

Carrier (Hoses and Cables)

1

4,8

11.

Hydraulic Hoses and Tubing

1

5

12.

Pins

8,12

Advertising
This manual is related to the following products: