JLG 110HX ANSI Service Manual User Manual

Page 73

Advertising
background image

SECTION 2 - PROCEDURES

3120636

– JLG Lift –

2-49

5.

Inspect all needle rollers for scoring, pitting or
excessive wear. Replace all rollers as necessary.

6.

Inspect planet gear pins for grooves, scoring or
excessive wear. Replace pins as necessary.

7.

Inspect all threaded components for damage includ-
ing stretching, thread deformation, or twisting.
Replace as necessary.

8.

Inspect oil seal surfaces in hub and spindle for burrs
or sharp edges. Dress applicable surfaces or
replace components as necessary.

9.

Inspect mating surfaces of hub, ring gear and cover
for burrs and sharp edges. Dress applicable sur-
faces or replace components as necessary.

Assembly

1.

If necessary, assemble the hub/spindle assembly
(36 and 30) as follows:

a. With large open end of hub (36) up, press bear-

ing cup (33) into hub. If no press is available,
bearing cup may be frozen and tapped into
place with a non-metallic faced hammer.

b. Turn hub over, small diameter up. Install two

pipe plugs (37) into hub.

c. Press bearing cup (33) into small diameter end

of hub. If no press is available, bearing cup may
be frozen and tapped into place with a non-
metallic faced hammer.

d. Install bearing cone (32) into bearing cup.

e. Press seal (31) into hub counterbore with flat

metal side facing out. Use a flat object to ensure
that seal is pressed evenly and is flush with hub
face.

f. Lower hub onto spindle (30) with large open end

up.

Advertising
This manual is related to the following products: