Mast side profile mast chain/cable adjuster s – JLG 15VPSP Service Manual User Manual

Page 50

Advertising
background image

SECTION 2 - SERVICE PROCEDURES

2-32

– JLG Lift –

3120797

2.

Tighten nylock-nut just enough to remove excessive
slack from sequencing cable. The springs should
not be compressed more than 25% after adjusting.

3.

Run mast through several cycles to verify cable/
chain adjustments and ensure no interference exists
between chain anchor brackets and mast.

Figure 2-19. Mast Chain/Cable/Sequence Cable Adjustment Components. (Typical)

SECTION-1

FIXED

TO BASE

SEQUENCE CABLE

ADJUST NUT

CHECK IF OVERALL HEIGHT

OF MACHINE FROM

FLOOR TO TOP OF MAST

IS WITHIN SPECIFICATION

SECTION-2

EXTENDED BY

CYLINDER

SECTION-5

(PLATFORM

HEADER SECTION)

EXTENDED BY

CHAIN/CABLE

CHAIN/CABLE

ANCHOR PLATE

ADJUST NUT

JAM NUT

THREADED

CHAIN/CABLE

END

SECTION-4

EXTENDED BY

CHAIN/CABLE

SECTION-3

EXTENDED BY

CHAIN

STEP APPROXIMATELY

7/16 in. (12mm)

MAST SIDE PROFILE

MAST CHAIN/CABLE ADJUSTER

S

Note: When

p

ply Loctite #242 to the

threads under the jam nut.

.

chain adjustment

is complete, before

tightening the jam nut

against the adjust nut,

a

Advertising