JLG 660SJ Service Manual User Manual

Page 122

Advertising
background image

SECTION 4 - BOOM & PLATFORM

4-20

– JLG Lift –

3120840

Assembly

NOTE: For location of components See Section 4-23., Loca-

tion of Components - Articulating Jib Boom.

1.

Align lift cylinder with attach holes in articulating jib
boom. Using a soft head mallet, install cylinder pin
#7 into articulating jib boom and secure with mount-
ing hardware.

2.

Align rotator support with attach hole in articulating
jib boom. Using a soft head mallet, install rotator
support pin #6 into articulating jib boom and secure
with mounting hardware.

3.

Align bottom tubes with attach holes in rotator sup-
port. Using a soft head mallet, install rotator support
pin #5 into articulating jib boom and secure with
mounting hardware.

4.

Align articulating jib boom with attach hole in articu-
lating jib boom pivot weldment. Using a soft head
mallet, install rotator support pin #4 into articulating
jib boom and secure with mounting hardware.

5.

Align bottom tubes with attach holes in articulating
jib boom pivot weldment. Using a soft head mallet,
install rotator support pin #3 into articulating jib
boom pivot weldment and secure with mounting
hardware.

6.

Align articulating jib boom pivot weldment with
attach holes in fly boom assembly. Using a soft head
mallet, install pivot pin #2 into fly boom assembly
and secure with mounting hardware.

7.

Align the slave leveling cylinder with attach holes in
articulating jib boom pivot weldment. Using a soft
head mallet, install slave leveling cylinder pin #1
into articulating jib boom pivot weldment and secure
with mounting hardware.)

Main Boom Telescope Cylinder Removal

8.

Place machine on a flat and level surface, with main
boom in the horizontal position.

9.

Shut down engine. Support main boom basket end
with a prop. See Figure 4-24., Boom Positioning and
Support, Cylinder Repair (S Models).

HYDRAULIC LINES AND PORTS SHOULD BE CAPPED IMMEDI-
ATELY AFTER DISCONNECTING LINES TO AVOID THE ENTRY OF
CONTAMINANTS INTO THE SYSTEM.

10.

Tag and disconnect hydraulic lines to telescope cyl-
inder. Use a suitable container to retain any residual
hydraulic fluid. Cap hydraulic lines and ports.

11.

Remove the hardware securing cover plate on bot-
tom of the base boom section and remove cover.

NOTE: Do not allow cable to rotate. This may damage the

cable.

12.

Clamp both threaded ends of cable to prevent rota-
tion. Note: Do not clamp on threads. Remove jam
nuts and loosen adjustment nuts so there is slack in
the cables. (See Figure 4-2., Clamping Wire Ropes).

13.

Remove the hardware securing push bar to turnta-
ble and telescope cylinder.

14.

Using a suitable brass drift, carefully drive the push
bar pins from the telescope cylinder rod and turnta-
ble.

15.

Remove hardware securing cable adjustment block
to aft end of the base boom section and remove
block.

Figure 4-24. Boom Positioning and Support, Cylinder Repair (S Models)

Advertising
This manual is related to the following products: