SECTION 4 - BOOM & PLATFORM

4-28

– JLG Lift –

3120840

3.

Install new seals (11), back-up ring (12), cap bearing
(13), bearing packing (14) and thrust ring (10) on
end cap (5).

4.

Place the actuator in the vertical position, install the
piston sleeve (3) in timed relation to the housing (1).

DO NOT MISALIGN THE SLEEVE TOO MUCH ANY ONE WAY, AS IT
WILL MARK THE CYLINDER BORE.

NOTE: The timing marks (the small punch marks on the

face of each gear), must be aligned for proper shaft
orientation. (See Actuator Timing.)

5.

Install the shaft (2) into housing (1) by aligning the
proper punched timing marks. (See Actuator Tim-
ing.)

6.

Temporarily tape the threaded portion of the shaft
will help installation past the shaft seals (masking
tape).

7.

The end cap (5) is torqued to 54 - 68 Nm, such that
the actuator begins rotation at approximately 6.9 Bar
pressure.

8.

The end cap must be secured against the shaft by
installing axial set screws (4).

4.11 DRIVE CARD SETUP PROCEDURES

NOTE: The following procedures are to be used as a begin-

ning basis for controller adjustment. After completing
the procedure, final adjustments are to be made
based on the machines function speed.

Figure 4-35. Actuator Timing

Table 4-1. Function Speeds

Function

Function Speed

In Seconds

Telescope

Extend

48-61

Retract

24-32

Lift

Up

46-60

Down

33-43

Articulating Jib Boom

Up

22-29

Down

16-22

Swing Speed

Full 360°

79-101

Platform Rotation

Left

22-30

Right

22-30

Drive Speed (2WD)

28-32 @ 200ft.

Drive Speed (4WD)

32-36 @ 200ft.