5 function speeds (machines built after s/n 38697), 6 torque requirements, Torque requirements -3 – JLG 120HX ANSI Service Manual User Manual

Page 13

Advertising
background image

SECTION 1 - SPECIFICATIONS

3120686

– JLG Lift –

1-3

1.5

FUNCTION SPEEDS (MACHINES BUILT
AFTER S/N 38697)

Telescope

Extend - 80-100 seconds.

Retract - 85-100 seconds.

Lift

Up - 85-100 seconds.

Down - 75-100 seconds.

Extend-A-Reach

Up - 15-25 seconds.

Down - 15-25 seconds.

Swing Speed 360°

143-243 seconds.

Platform Rotation

Left - 7-20 seconds.

Right - 7-20 seconds.

Ground to 120’

165 to 200 seconds.

From 120’ to Ground

150 to 200 Seconds

Ground to 120’ to Ground

315 to 400 Seconds

1.6

TORQUE REQUIREMENTS

NOTE: See Section 2 for tightening sequence of turntable

bearing bolts.

NOTE: When maintenance becomes necessary or a fas-

tener has loosened, refer to the Torque Chart Figure
1-1 to determine proper torque value.

Table 1-1. Torque Requirements

Description

Torque Value

(Dry)

Interval Hours

Bearing To Chassis

220 FT LB

(298 NM)

200/500*

Bearing To Turntable

220 FT LB

(298 NM)

200/500*

Wheel Lugs

300 FT LB

(407 NM)

50

Drive Torque Hub to
Spindle

260 FT LB

(353 NM)

500

Boom Chains

59 FT LB (80

NM)

200

Swing Motor to Swing
Brake

75 FT LB (102

NM)

500

Swing Brake to
Torque Hub

110 FT LB

(149 NM)

500

Torque Hub to Mount-
ing Plate

260 FT LB

(353 NM)

500

Frame Valve Bolts

80 IN LB (9

NM)

See Note

Below**

* Retorque swing bearing bolts after first 200 hours of oper-
ation and every 500 hours thereafter.

**Re-torque frame valve bolts after checking or adjusting
steer pressure.

Advertising