JLG 120HX ANSI Service Manual User Manual

Page 80

Advertising
background image

SECTION 2 - PROCEDURES

2-60

– JLG Lift –

3120686

11.

Check for proper operation while engine is running.

12.

Check for proper lubrication.

13.

Check for evidence of scratches, nicks or rust and
for straightness of rod.

14.

Check for condition of element; replace as neces-
sary.

15.

Check for proper inflation.

16.

Clean or replace suction screen.

17.

Drain and clean.

* To be performed quarterly.

** Inspection and Maintenance Code 10, 12, 16 to per-
formed every two years.














Table 2-7.Preventive Maintenance and Inspection Schedule

AREA

DAILY

WEEKLY

INTERVAL

MONTHLY

3 MONTH

6 MONTH

YEARLY

BOOM

1.

Platform

1,4

2.

Platform Gate

1,4

12

3.

Platform Rotator

5,11

8, 12

4.

Footswitch

1,11

5.

Controllers

1,11

6.

Switches

1,11

7.

Placards and Decals

1,2

8.

Control Tags

1,2

9.

Valves

1,11

5,6

10.

Carrier (Hoses and Cables)

1

4,8

12.

Pins

8, 12

13.

Bushings

8, 12

14.

Wear Pads

8, 12

15.

Cylinders

1,5,6,13

12

Boom Chain Adjusters

9

Sheaves

8, 12

Radius Limit Tape

1, 2

17.

Drift Test*

Advertising