JLG 120HX ANSI Service Manual User Manual

Page 81

Advertising
background image

SECTION 2 - PROCEDURES

3120686

– JLG Lift –

2-61

TURNTABLE

1.

Engine Oil (see mfg. manual)

3

5

2.

Battery

3

5

3.

Radiator

3, 5

4.

Air Cleaner

1

14

5.

Exhaust System

1

1,5

7.

Engine Mount

1

8.

Ground Controls

1,2,11

9.

Main Hydraulic Pump

1

5

10.

Auxiliary Power Pump

1

5

11.

Valves

1,11

5

12.

Hydraulic Filters

5, 14

14

13.

Hydraulic Hoses

1

5

14.

Hydraulic Oil Tank**

3

5

4

15.

Breather Hydraulic Tank

6,14

16.

Fuel Tank

3,5

4

17.

Cylinders

1,5,6,13

4, 12

19.

Turntable Locking Pin

1,7

20.

Horizontal Limit Switch

1,7

21.

Oil Coupling

5

22.

Placards and Decals

1,2

Tilt Alarm Switch

1, 7

23.

Swing Bearing

1

9, 12

24.

Swing Brake

1,5,6

8

25.

Swing Hub

1, 3, 5,6

10

Table 2-7.Preventive Maintenance and Inspection Schedule

AREA

DAILY

WEEKLY

INTERVAL

MONTHLY

3 MONTH

6 MONTH

YEARLY

Advertising