Machine Power Up using the PSL

NOTE: When entering code on the keypad, a short beep

indicates a properly depressed key, a long beep
indicates an error in depressing key. If an error
occurs, you must restart the code entry process
again.

1.

Enter the four digit code on the PSL key pad. The
ACCEPT - AMBER LED indicator will be lit if the code
is correct.

2.

Press the keypad ON button. The ON - GREEN LED
indicator will light and power will be supplied to the
Ground Control Station.

3.

At the ground control station, turn the main power
selector switch from OFF to ON.

4.

The machine will now operate normally.

Machine Power Down

1.

At the Ground Control Station set the main power
selector switch to the OFF position.

2.

Press the OFF button on the PSL keypad. No LEDs
on the PSL box will be lit.

Changing the Operator’s Code

The PSL Operators Code can be changed by a supervisor
should the need occur. A separate permanent Supervi-
sor’s Code matched to the serial number of the PSL box is
included on a sheet in the PSL user manual supplied with
the machine.

1.

Enter the Supervisor’s code on the key pad. The
PROGRAM - RED LED will be lit if correct code is
entered.

NOTE: The ON or OFF button cannot be one of the four dig-

its of the Operator’s code.

2.

Enter a new four (4) digit Operator’s code on the
keypad. The ACCEPT - AMBER LED will light up if
the new Operator’s code is accepted.

3.

Press the OFF button on the keypad to activate the
new Operator’s code.

NOTE: The new Operator’s code will remain in the PSL even

when power is removed from the equipment, or until
the Supervisor changes the Operator’s code.

3.9

STOWING MACHINE

1.

Ensure that platform is fully lowered, turn POWER
ON/OFF key switch (on the Ground Control Station)
to the OFF position.

IMPORTANT

WHEN MOVING MACHINE PLEASE FOLLOW ALL SAFETY PRECAU-
TIONS DESCRIBED IN “TRANSPORTING AND LIFTING” FOR
PROPER PROCEDURES FOR TRANSPORTING.

2.

Move machine to a well-protected and well-venti-
lated area.

3.

Set the floor stop when parking machine for an
extended period of time.

4.

Remove key from Ground Control Panel POWER
ON/OFF key switch to disable machine from unau-
thorized use.

5.

If necessary, cover the machine so it will be pro-
tected if in a hostile environment.

NOTE: If required, the battery should be charged in prepara-

tion for next work day in accordance with Section
3.7, “Ba
ttery Charging” .

Advertising