Hydraulic quick-switch device, Hydraulic quick-switch device -9 – JLG 266 LoPro Operator Manual User Manual

Page 81

Advertising
background image

Section 5 - Attachments and Hitches

5-9

3126023

Hydraulic Quick-Switch Device

This installation procedure is designed for one-person operation.

1. Retract quick-switch device to provide clearance.

Check to be sure lock pin is disengaged.

2. Align attachment pin with recess in attachment.

Raise boom slightly to engage attachment pin in
recess.

3. Engage quick-switch device.

4. Press the button (1) and at the same time

move the joystick (2) to engage or (3) to
disengage the quick-switch device.

5. Raise boom to eye level and visually

check that the quick-switch pin protrudes
through the hole. If the pin does not
protrude through the hole, place the
attachment on the ground and return to
step 2.

6. If attachment is equipped, connect auxiliary hydraulic hoses. See “Hydraulic

Operated Attachment” on page 5-10.

OZ0610

1

2

3

OZ0900

ENGAGED

DISENGAGED

Advertising
This manual is related to the following products: