SECTION 4 - MACHINE OPERATION

4-14

– JLG Lift –

3121283

4.10 EMERGENCY TOWING PROCEDURES

The following procedures are to be used ONLY for emergency
movement to a suitable maintenance area.

THE ALLOWABLE TOWING SPEED IS 1.9 MPH (3 KPH). THE MAXIMUM
ALLOWABLE TOWING DISTANCE IS 0.6 MILES (1 KM).

1. Chock wheels securely.

2. Engage the mechanical release on both drive hubs by

loosening, completely reversing, and tightening the two
bolts on each hub. Refer to Figure 4-5., Drive Discon-
nect Hub

3. Connect suitable equipment, remove chocks, and move

machine.

After moving machine, complete the following procedure:

1. Position machine on a firm level surface.

2. Chock wheels securely.

3. Disengage the mechanical release on both drive hubs

by loosening, completely reversing, and tightening the
two bolts on each hub.

4. Remove chocks from wheels as desired.

Figure 4-5. Drive Disconnect Hub