10 emergency towing procedures, 10 emergency towing procedures -14, Drive disconnect hub -14 – JLG 18RS Operator Manual User Manual
Page 58
SECTION 4 - MACHINE OPERATION
4-14
– JLG Lift –
3121283
4.10 EMERGENCY TOWING PROCEDURES
The following procedures are to be used ONLY for emergency
movement to a suitable maintenance area.
THE ALLOWABLE TOWING SPEED IS 1.9 MPH (3 KPH). THE MAXIMUM
ALLOWABLE TOWING DISTANCE IS 0.6 MILES (1 KM).
1. Chock wheels securely.
2. Engage the mechanical release on both drive hubs by
loosening, completely reversing, and tightening the two
bolts on each hub. Refer to Figure 4-5., Drive Discon-
nect Hub
3. Connect suitable equipment, remove chocks, and move
machine.
After moving machine, complete the following procedure:
1. Position machine on a firm level surface.
2. Chock wheels securely.
3. Disengage the mechanical release on both drive hubs
by loosening, completely reversing, and tightening the
two bolts on each hub.
4. Remove chocks from wheels as desired.
Figure 4-5. Drive Disconnect Hub