11 swing-away jib to erect the jib – JLG 120HX Operator Manual User Manual

Page 60

Advertising
background image

SECTION 4 - MACHINE OPERATION

4-10

– JLG Lift –

3120818

SECURE TURNTABLE WITH TURNTABLE LOCK BEFORE TRAV-
ELING LONG DISTANCES OR HAULING MACHINE ON TRUCK/
TRAILER.

4.11 SWING-AWAY JIB

To Erect the Jib

1.

Remove the lockpin from the jib plates.

2.

With the aid of an assistant, swing the jib until
straight with the boom and the holes in the jib plates
align.

3.

Install the lockpin through aligned holes in the jib
plates. The machine can now be operated from the
platform controls.

To Stow the Jib

1.

Remove the lockpin from the jib plates.

2.

With the aid of an assistant, swing the jib closed until
its alongside the boom and the holes in the jib plates
align.

3.

Install the lockpin through the aligned holes in the jib
plates. The machine must now be operated from the
ground controls or the remote control box.

Figure 4-6. Lifting Chart

Gross Weight

Standard Machine

Dimension A

44,000 lbs. (19,960 kg)

82.7 in. (210 cm)

LIFT HERE

CENTER

OF

GRAVITY

ROTATION

L

A

C

Advertising