Personnel work platform - fork mounted, Personnel work platform - fork mounted -39 – JLG G12-55A Operator Manual User Manual

Page 111

Advertising
background image

Section 5 - Attachments

5-39

31200745

Personnel Work Platform - Fork Mounted

Use Appropriate Carriage Attachment Capacity Chart

To determine maximum capacity, refer to “Telehandler/
Attachment/Fork Capacity”
on page 5-4.

The operator and personnel in platform must read and understand the
separate personnel work platform manual prior to installing and using a
platform.

The joystick (1) controls lift/lower and extend/retract movement of the boom.

The tilt switch (2) controls platform tilt.

• Press left side of switch to tilt up.

• Press right side of switch to tilt down.

Installation Procedure:

• Ensure carriage is properly installed. Refer to “Attachment Installation” on

page 5-9.

• Secure the fork mounted platform to the forks by sliding the fork mounted

platform onto the parent forks and install the retaining pin behind the vertical
shank of the fork.

OY1610

OY2960

1

2

Advertising
This manual is related to the following products: