Swinging the boom, Raising and lowering the main boom, Telescoping the main boom – JLG 460SJ Operator Manual User Manual

Page 70

Advertising
background image

SECTION 4 - MACHINE OPERATION

4-12

– JLG Lift –

3121216

TO AVOID A COLLISION AND INJURY IF PLATFORM DOES NOT STOP WHEN A CONTROL
SWITCH OR LEVER IS RELEASED, REMOVE FOOT FROM FOOTSWITCH OR USE EMERGENCY
STOP SWITCH TO STOP MACHINE.

Swinging the Boom

Depress footswitch to swing boom, with footswitch activated,
position SWING control switch to RIGHT or LEFT for direction
desired.

WHEN SWINGING THE BOOM MAKE SURE THERE IS AMPLE ROOM FOR THE BOOM TO
CLEAR SURROUNDING WALLS, PARTITIONS AND EQUIPMENT.

Raising and Lowering the Main Boom

NOTE:

Lift up will not function when the boom is near full elevation
and the platform is out of level.

To raise or lower the Main Boom, with footswitch activated,
position Main Boom Lift lever to UP or DOWN until desired
height is reached.

Telescoping the Main Boom

To extend or retract the main boom, with the footswitch acti-
vated, position the Main Telescope Control Switch to the in or
out position and hold until the platform reaches the desired
position.

Advertising
This manual is related to the following products: