3 component removal, General, 3 component removal -5 – JLG LSS Verticals Operator Manual User Manual

Page 13

Advertising
background image

SECTION 2 - SERVICE PROCEDURES - LOAD SENSING SYSTEM

3124289

– JLG Lift –

2-5

2.3 COMPONENT REMOVAL

General

Before disconnecting any electrical component always
turn off the machine power supply.

Refer to wiring schematic in the Troubleshooting section
for wiring connection information.

Platform removal will depend on machine model, consult
the machine’s Service/Maintenance Manual.

LSS Panel Component Installation - (Manually

Propelled Lifts Only)

LSS Warning Alarm Installation

1. Alarm Body

2. Alarm Attach Nut

LSS Warning Lamp Installation

1. Lamp Attach Nut and Washer
2. Lamp Assembly

Note: Shown with alarm removed for illustrative purposes
only.

LSS Panel Installation

1. LSS Panel

3. Drop panel down and lift out

2. Panel Fasteners

Note: Wiring harness connectors to module, alarm and
lamp may need to be disconnected when removing
panel.

LSS Timing Module Installation

1. LSS Indicator Panel 3. LSS Timing Module
2. Module Fasteners

1

2

3

Advertising