Overload recovery, Overload recovery -2 – JLG LSS Verticals Operator Manual User Manual

Page 8

Advertising
background image

SECTION 1 - OPERATION

1-2

– JLG Lift –

3124289

Overload Recovery

Further movement of the platform is permitted by remov-
ing excess platform load until the LSS resets. This may
require removing load until a load less than rated capacity
is achieved.

NOTE: There is a 5 second delay between overload reset

and machine function activation.

THE LOAD SENSING SYSTEM WILL REQUIRE ADJUSTMENT
WHEN ONE OR MORE OF THE FOLLOWING CONDITIO NS
OCCUR:

• Load Sensing System initial installation
• LSS component is disassembled or replaced

THE LOAD SENSING SYSTEM REQUIRES PERIODIC FUNCTION
VERIFICATION NOT TO EXCEED 6 MONTHS FROM PREVIOUS
VERIFICATION.

Advertising