Overload Recovery
Further movement of the platform is permitted by remov-
ing excess platform load until the LSS resets. This may
require removing load until a load less than rated capacity
is achieved.
NOTE: There is a 5 second delay between overload reset
and machine function activation.
THE LOAD SENSING SYSTEM WILL REQUIRE ADJUSTMENT
WHEN ONE OR MORE OF THE FOLLOWING CONDITIO NS
OCCUR:
• Load Sensing System initial installation
• LSS component is disassembled or replaced
THE LOAD SENSING SYSTEM REQUIRES PERIODIC FUNCTION
VERIFICATION NOT TO EXCEED 6 MONTHS FROM PREVIOUS
VERIFICATION.