4 Commissioning 

The power supply connection and interfaces of this device are installed underneath a protective cover. This cover 
has to be removed in order to connect the power supply lead and the interface cables.  

All supply leads and all required data leads have to be connected before commissioning. All supply leads and all 
required data leads have to be connected before commissioning. 

 

Warning: 

The device must be switched off before connecting or disconnecting any cables in order to 
prevent damage to the electronics! 

The device may only be switched on after acclimatising to the ambient temperature in 
order to avoid condensate accumulation. Make sure to meet the permissible voltage 
requirements for this device. 

After switching off and before switching on you must wait for at least 5 seconds. 

 

Note: 

The screen of a data cable must always be connected with the connector housing (EMC). 

Under the embedded operating system, interfaces must explicitly be enabled and 
required drivers must be installed in order to be able to use them.

4.1 Available Interfaces 

 

Abb. 3:  

 

 

Note: 

If the case is connected with earth potential at the provided PE contact (e.g. by connecting 
the PE contact with the device plug), the electrical insulation is no longer given. This also 
applies if the device is installed by using a metal retainer clip. 

If you want to have the device electrically insulated from the power supply, you 
have to use a method of installation that ensures appropriate insulation.

Pos: 18 /Datentechnik/Inbetriebnahme/Reihenfolge der Inbetriebnahme/Reihenfolge der Inbetriebnahme für VMT 60xx-Serie @ 1\mod_1222073159179_6.doc @ 4100 @

4.2 Cable installation 

The interfaces as well as power supply plugs for the device are accommodated in the device service slot. 

 

4.3 Order of Steps during Commissioning 

• 

With 24V DC devices: Connect the power supply cable with the terminals by using cable end sleeves 

• 

Connect cable for serial / parallel data transmission and fasten the screws between the connector plug 

and socket 

• 

Plug in all other required cables and protect from accidental disconnection 

 