X-cabled bays – Anchor NAVI-TRAC 40 WIDE HIP-END User Manual

Page 18

Advertising
background image

18

40’ NAVI-TRAC COMPLETE

WITH (2) 15’ MID BAYS

1.

ALL ENGINEERING ON THE 40’ NAVI-TRAC WAS DONE WITH THE WALLS IN PLACE. (FULLY

ENCLOSED). SEE NEXT PAGE FOR SIDEWALL INSTALLATION.

2.

INSTALL, STAKE, AND TENSION ALL GUY WEBS, AS SHOWN. TENSION FABRIC SO THAT ALL CATENARY
ARCHES ARE EQUIDISTANT BELOW THE EAVE BARS.

3.

REVIEW PAGE 12 FOR GUYING AND TENSIONING INSTRUCTIONS.

X-CABLED BAYS

NAVI-TRAC UNITS 100 FT. OR MORE IN LENGTH MUST
HAVE AN X-CABLED BAY NEAR THE MIDDLE OF THE
UNIT (AND/OR EQUALLY SPACED) FOR EVERY 100 FT.
UNIT OF LENGTH.

STAKE PLATES AT PROPER SPACING BEFORE
INSTALLING THE X-CABLES. THEN, ADJUST
TURNBUCKLES UNTIL CABLE IS SNUG

REMOVE NUTS FROM THE BOLTS THAT PIN THE
BASEPLATE TO THE UPRIGHT. TURN BOLTS SO THE
THREADS ARE TO THE INSIDE (FACING EACH OTHER).
THREAD CABLE EYE NUTS ONTO BOLTS TO SECURE
THE CABLE.

SUBSTITUTE BOLTS FOR PINS AT
THE TOP OF BOTH UPRIGHTS AND
BOTTOM AND TOP OF BOTH RAF-
TERS. THREADS SHOULD POINT
INWARD TOWARD EACH OTHER.
THREAD CABLE EYE NUTS ONTO
EACH BOLT TO SECURE THE CABLES
AS SHOWN.

FOR CABLE CONNECTIONS AT
MID PORTION OF RAFTERS,
INSERT THE BOLTS IN THE
HOLES OF THE RAFTER THAT
ARE JUST ABOVE AND JUST
BELOW THE PURLIN CONNEC-
TION. THREADS SHOULD POINT
INWARD TOWARD EACH OTHER.
THREAD CABLE EYE NUTS
ONTO EACH BOLT TO SECURE
THE CABLES AS SHOWN.

PURLIN

X-CABLING IS IDENTICAL
ON BOTH SIDES OF THE
STRUCTURE.

LOWER RAFTER X-CABLES ARE
COLOR-CODED RED AND LABELED 10,
15, OR 20 ACCORDING TO BAY SIZE.

UPRIGHT X-CABLES ARE
COLOR-CODED GREEN
AND LABELED 10, 15, OR 20
ACCORDING TO BAY SIZE.

UPPER RAFTER X-CABLES
ARE COLOR-CODED BLUE
AND LABELED 10, 15, OR 20
ACCORDING TO BAY SIZE.

Advertising