Page 22
 
22
 
 
NEVER go under a raised lift platform until load is removed and 
lift is securely blocked in raised position with maintenance 
devices. 
 
See "Maintenance Device" section of this manual. 
 
Lock-out/tag-out power source. 
13. Base frame of lift has pre-drilled holes for anchoring floor. Anchor lift to floor. Lifts with oversize
platforms have minimum pull out requirements of 2,000 lbs. for each anchor. See “Shimming And 
Anchoring Lift To Concrete”. 
 
14. Make permanent electrical and hydraulic connections and operate lift through a few cycles. 
 
15. Clean up debris and spilled oil from area. Dispose of oil in an environmentally safe manner. 
 
16. Touch-up paint is available from Autoquip for repair of damaged paint surfaces. 
 
17. Train personnel on lift operation, all safety features and procedures. 
 
4.2 Shimming And Anchoring Lift To Concrete
Recommended concrete anchor bolts are: HILTI “Kwik-Bolt”, Molly Parabolt or similar. 
 
1. Verify lift is positioned correctly. 
 
2. Drill holes in concrete as specified by anchor bolt 
manufacturer.
 
3. Install and tighten anchors as specified by anchor bolt 
manufacturer.
 
4. After lift has been aligned, leveled and shimmed, and 
anchors have been installed, pour grout under entire 
base frame. 
 
5. When grout has set and cured, tighten nuts on anchor 
bolts.
 
6. Route hydraulic hose or electrical cord through conduit 
in pit wall.
4.3 Remote Power Unit Installation
1. The remote power unit is to be located in an area protected from the elements and should be
installed prior to the lift to facilitate lift operation during installation into the pit.
^ WARNING