Installation instructions – Autoquip SERIES 35 LOW PROFILE User Manual

Page 19

Advertising
background image

INSTALLATION INSTRUCTIONS


WARNING

!

Before installing the lift, read & follow the recommended
safety practices in the Safety Practices section. Failure to
follow these safety practices could result in death or serious
injury


FLOOR

INSTALLATION


1. Make sure the installation area is clean before starting. Check the mounting

surface of the floor with a level or straight edge. If the floor is not level, add
shims or grout under the lift base frame along the entire perimeter of the base
to achieve a level and flat base installation. A level base will ensure proper
wheel tracking and smooth lift operation.


2. If the permanent electrical work is not complete, some means of temporary

lines with an on-off device for the power supply should be set up for testing
purposes.


3. Place the lift in the installation area and level the base frame per note #1.

NOTICE !

When moving the lift, do not attempt to pick it up by the
platform; it is hinged and could be damaged. Pick up the lift
from under the base frame ONLY using a strap sling.

4. Make temporary electrical connections and permanent hydraulic connections.

Raise the lift approximately one foot using the “UP” button. Then lower the lift
back to fully collapse, holding the “DOWN” button for approximately 60
seconds. Repeat this process five to seven times to bleed any air out of the
hydraulic system.

5. Raise the lift to the top of its travel and make positioning adjustments. Check

for the proper height. If needed, shim to the desired height. DO NOT “spot”
shim. Shim the full length of the base frame. This will prevent the frame from
sagging under an exceptionally heavy load.


19

Advertising