Installation instructions, Figure 9 single leaf bascule bridge – plan view 17 – Autoquip BASCULE BRIDGE - DOUBLE LEAF User Manual

Page 17

Advertising
background image


____" HING

E CH

ANNEL

LENGTH

____" CLE

VIS

CHANNEL

LENGTH

AND DO

CK

OPENING

N

O

N - SKID

REMOTE POWER UNIT

FOR POWER UNIT MOU

N

TED RE

MO

TE

LY, IN

STAL

L TH

E (3)

REMO

TE PO

WER

UNIT TO

CUT

OUT

FO

R

LI

FTING

RAMS.

(1) 1

/2" (SC

H

. 80

) B

LAC

K PIPE

& FITTINGS FROM

REMOTE POWER UN

IT TO

CUTOUT FO

R SAFETY LEGS.

___

__" (__'

- __"

) DOCK

FACE TO

DOCK FACE

H

Y

DR

AULIC LINES & (1)

CONTROL COND

UIT.

(2) 3/8

" (SCH. 8

0) BL

ACK

PIPE &

FITTINGS FRO

M

6"H WHEEL CU

RBS

3" x 3" x 1/

4" THK. CURB

TYPICAL BOTH ENDS

ANGLES BY

PI

T CONTRACTOR.

15 1/4

"

FOR POWER UNIT MOU

N

TED UNDER BRIDGE

ON TH

E C

U

TOU

T

, INSTALL

ONLY

MOUNTED ON 24"

CUTOU

T

PIT MOUNTED POW

E

R

U

N

IT

___"

___"

THE (2) CONDUITS. (2) 3/4"

CONDUITS.

(1) FOR C

O

NTR

O

L & (1) FOR POWER.

PLA

C

EMENT W

H

EN

HYDRAULIC POWER U

N

IT

22"

2" CLEARAN

CE

26"

12"

18"

C

U

TOUT IF DESIR

E

D.

STE

E

L PLATE

P

O

WER U

N

IT ON

THE

24" MIN

.

WILL PE

RMIT IN

STA

LLATIO

N

OF

STAND

A

R

D

SPAC

ING

OF RAMS

24

" CUTOUT

INSTALLATION INSTRUCTIONS

Figure 9 Single Leaf Bascule Bridge – Plan View

17

Advertising