Installation instructions – Autoquip BASCULE BRIDGE - DOUBLE LEAF User Manual

Page 22

Advertising
background image

INSTALLATION INSTRUCTIONS


1/2" N.P.T. TEE FOR (2) LIFTING
RAMS (FUNRISHD BY AUTOQUIP)

CONNECTING HOSES - BY AUTOQUIP.

PUMP

WEATHERPROOF NEMA-4

JCT. BOX WITH LABELED

LEADS. INSTALLER TO

RUN FLEXIBLE LINE FROM

POWER AND CONTROL

WIRING.

JUNCTION

BOX

REMOVABLE

WEATHERPROOF

COVER

FACE OF DOCK

BOLTS FOR

REMOVABLE

COVER

WEATHERPROOF JCT.

BOX FOR POWER &

CONTROL WIRING

(BY INSTALLER)

24"

CUTOUT

RESERVOIR

DRAIN PLUG

22"

1/2" LINE

FOR LIFTING

CYLINDERS

MOTOR

29 1/4"

1/4" PRESSURE LINES
FOR SAFETY LEGS,

CONNECTING HOSES
BY AUTOQUIP.

1/4" LINES FOR SAFETY
LEGS. AUTOQUIP SUPPLIES

(2) 1/4" HYDRAULIC WIRE
BRAID HOSES. INSTALLER
TO CONNECT & DRESS
HOSES TOWARDS
CENTERLINE OF BRIDGE.

MOUNT RESERVOIR
3 3/8" FROM CENTERLINE
OF OUTSIDE RAM

RESERVOIR

CL

RAM

23"


Figure 15 Hydraulic Connection Detail – Pit Mounted Power Unit









22