Installation instructions – Autoquip BASCULE BRIDGE - DOUBLE LEAF User Manual
Page 22

INSTALLATION INSTRUCTIONS
1/2" N.P.T. TEE FOR (2) LIFTING
RAMS (FUNRISHD BY AUTOQUIP)
CONNECTING HOSES - BY AUTOQUIP.
PUMP
WEATHERPROOF NEMA-4
JCT. BOX WITH LABELED
LEADS. INSTALLER TO
RUN FLEXIBLE LINE FROM
POWER AND CONTROL
WIRING.
JUNCTION
BOX
REMOVABLE
WEATHERPROOF
COVER
FACE OF DOCK
BOLTS FOR
REMOVABLE
COVER
WEATHERPROOF JCT.
BOX FOR POWER &
CONTROL WIRING
(BY INSTALLER)
24"
CUTOUT
RESERVOIR
DRAIN PLUG
22"
1/2" LINE
FOR LIFTING
CYLINDERS
MOTOR
29 1/4"
1/4" PRESSURE LINES
FOR SAFETY LEGS,
CONNECTING HOSES
BY AUTOQUIP.
1/4" LINES FOR SAFETY
LEGS. AUTOQUIP SUPPLIES
(2) 1/4" HYDRAULIC WIRE
BRAID HOSES. INSTALLER
TO CONNECT & DRESS
HOSES TOWARDS
CENTERLINE OF BRIDGE.
MOUNT RESERVOIR
3 3/8" FROM CENTERLINE
OF OUTSIDE RAM
RESERVOIR
CL
RAM
23"
Figure 15 Hydraulic Connection Detail – Pit Mounted Power Unit
22