Installation instructions, Figure 13 bridge hinge clevis detail, Figure 14 cylinder base clevis detail 21 – Autoquip BASCULE BRIDGE - DOUBLE LEAF User Manual
Page 21

INSTALLATION INSTRUCTIONS
GRIND TOP SMOOTH AFTER FIELD
WELDING BY INSTALLER.
16"
MIN
.
20" MIN.
HINGE REACTION
HINGE CLEVISES SUPPLIED BY
AUTOQUIP. (14) HINGES TOTAL.
10" x 20.0 LB. CHANNEL.
W/ #5 REINFORCING BARS
NO SUBSTITUTION
BY AUTOQUIP.
(INSTALLATION BY PIT
CONTRACTOR)
Figure 13 Bridge Hinge Clevis Detail
BASE FURNISHED BY AUTOQUIP. PRE-DRILLED AND
TAPPED. FIELD WELD TO CHANNEL BY INSTALLER.
10" x 20.0# CHANNEL,
W/ #5 REINFORCING BARS
NO SUBSTITUTION
BY AUTOQUIP.
(INSTALLATION BY PIT
CONTRACTOR)
(4) 3/4"-10 UNC BOLTS WITH
LOCKWASHERS PER CYLINDER
CLEVIS. USE APPROPRIATE LENGTH BOLTS.
(2) 1/8" SHIMS AND (2) 1/4" SHIMS PER
CLEVIS. FURNISHED BY AUTOQUIP. SEE NOTE.
CYLINDER CLEVIS
PRE-DRILLED AND WELDED.
FURNISHED BY AUTOQUIP.
Figure 14 Cylinder Base Clevis Detail