Perform checkout procedures • fill out certificate – Carlin EZGasPro User Manual

Page 14

Advertising
background image

Model EZGas Pro gas burner — Instruction manual

Carlin part number MNEZGas Rev. 10/28/13

– 14 –

Where appliance instructions differ from this manual, follow the appliance instructions.

5. Perform checkout procedures • fill out certificate

Prepare burner for normal operation

Cycle burner off with appliance controls. Then turn off

power to the appliance.

Close the main manual gas valve.

Remove the U-tube manometer line from the combination

gas valve outlet pressure tap hose barb. Remove hose

barb and replace 1/8" NPT pipe plug in tapping.

Verify all components and wires are in place and burner

is ready for operation.

Train the user

Train the user to operate the burner and appliance un-

der normal conditions. Explain procedure to shut down

burner/appliance when required.

Review the user’s information manual (and the appliance

manual) with the user.

Verify the user is aware of all procedures specified in the

manual.

Verify user will not store or use combustible liquids or

materials or contaminants in the vicinity of the burner/

appliance.

Fill out the certificate

Fill out the Installation/Service certificate on the back

page of this manual.

Verify burner/appliance operation

Check burner/appliance/controls operation

Test operating and limit controls on appliance as specified

in appliance instruction manual.

Check operation of the 60200FR primary control by forc-

ing Latch-up (three consecutive lockouts during the same

call for heat) by closing the main manual gas cock and

cycling the burner. Press the reset button to reset when

the control locks out on flame failure. Do this two times

and the control should enter Latch-up. See page 12 to

reset control.

Check operation of airflow switch.

Remove cover from left side of burner. Remove two flag

terminals from pressure switch. Before initiating call-for-

heat, measuring resistance across the two airflow switch

connections should indicate infinity (overload). During

prepurge, zero ohms should be measured.

Verify burner operation

Start and stop the burner several times, allowing the

primary control to sequence through normal operation.

Verify correct operation of burner and control throughout.

Verify burner/appliance operation

(cont.)

Verify vent system operation

Verify vent is operating correctly and flue products are

properly exhausted from building.

Check operation of barometric damper and spill switch.

If the building contains any exhaust fans or conditions that

could affect vent performance, check burner/appliance/

vent operation with exhaust fans (or other conditions)

operating.

Advertising