Installation Procedure

17

Set a level for a dimmer:

Step 1:

Press

to enter the Test menu.

Step 2:

Use < or

to scroll the selection of dimmers, choose one or [ALL] dimmers.

Step 3:

Use + or - to set a level, press

. The menu will progress to the next dimmer.

Step 4:

Press

. “Exit Test Mode” displays.

•

Exit Test Mode and retain all Test levels, scroll to [Keep Test On] and
press

.

•

Exit Test menu, clearing all Test levels and return to the previous menu,
scroll to [Test: all off], press

.

•

Press < to return to the Test menu.

•

Press << to exit the Test menu, clearing all Test levels, and return to the main

menu.

Verify DMX512 Operation

Test each load with DMX512 input using a controle console or DMX512 test device.

Troubleshooting SmartLink

After all SmartLink control stations are installed and connected to the SmartLink enabled

product, check for shorts and cross-connections with a digital voltmeter.

•

Check the voltage between Net A and ground. This reading should be between 18
- 21 Volts.

•

Check the voltage between Net B and ground. This reading also should be
between 18-21 Volts.

•

Check the voltage between Net A and Net B. This reading should be between 36-
42 Volts.

Check that two LED indicators (located at CR1 and CR2) are illuminated on the LinkPower

supply board.

•

If both are illuminated the data connections are good.

•

If CR1 is illuminated but not CR2, Net A is shorted to ground.

•

If CR2 is illuminated but not CR1, Net B is shorted to ground.

•

If neither LED is illuminated, Net A and Net B are both shorted.

If you have any difficulties installing your system, please contact ETC Technical Services

at the office nearest you.

Test Dimmer: [ All ]

T

Level: 100%