0 check the series 111 accumulator precharge, 0 check a non-mts accumulator precharge – MTS Series 111 Accumulator User Manual

Page 34

Advertising
background image

Description

Item

Close

C

Customer supplied items

12

Nitrogen Bottle Valve

13

Nitrogen Bottle

14

Nitrogen Bottle Pressure Gage

15

Regulator Output Pressure Gage

16

Regulator Output Pressure Valve

17

Regulator Shut-Off Valve

18

Nitrogen Supply Hose

19

Input Check Valve

20

Bleed Valve

21

Open

O

Close

C

6.2.1.0 Check the Series 111 Accumulator Precharge

This procedure is a continuation of "Check the Accumulator Precharge." Steps 1-3 of that procedure should
be preformed before completing this procedure.

The Series 111 Accumulators use the poppet-type valve.

1. Connect the charging kit chuck valve to the accumulator valve stem.

2. With an open-end wrench, turn the locknut counterclockwise on the accumulator valve assembly to open

the valve. Read the pressure on either the high or low accumulator charging kit pressure gage.

If the pressure reading is other than the required pressure level recorded on the accumulator, go to
the procedure “Change the Precharge Pressure.”

If the pressure level corresponds to the level recorded on the accumulator label, turn the locknut
clockwise to close the valve and continue this procedure.

3. Open the bleed valve on the accumulator charging kit and remove the chuck valve from the accumulator.

4. Replace the valve stem cap and protective cover on the accumulator.

6.2.2.0 Check a Non-MTS Accumulator Precharge

This procedure is a continuation of "Check the Accumulator Precharge." Steps 1-3 of that procedure should
be preformed before completing this procedure.