MTS Criterion 60 - Installation and Commissioning Plan User Manual
Page 11

Installation and Commissioning Plan
10 Criterion
TM
Series 60
INTRODUCTION
This Introduction provides a brief overview of the supplied equipment. It is not
intended as a substitute for formal training. MTS strongly recommends formal
classroom training at the MTS facility in hardware and software operation and
maintenance.
Note: The customer shall supply specimens to be used during the system
introduction. Typically, FSEs are trained in the operation and set-up of
MTS testing systems, but are not trained in the performance/procedure of
specific tests.
INTRODUCTION TOPICS:
B2.0 Review and Training
Item Description
Performed
On Site
B2.1 Loading
test
methods.
B2.2 Running
tests
B2.3
Saving, naming, and exporting data.
B2.4 Printing
reports.
B2.5
Backup and restoring data.
B2.6 Define
function
-
Make simple changes to the test flow.
-
Configure inputs.
-
Use the formula Builder to write simple results
formulas.