C3.0 custom method development (purchased option) – MTS Criterion 60 - Installation and Commissioning Plan User Manual
Page 13
Installation and Commissioning Plan
12 Criterion
TM
Series 60
C3.0 CUSTOM METHOD DEVELOPMENT (purchased option)
Item Description
Performed
On Site
C3.1
Develop method.
C3.2
Run and verify proper test operation.
C3.3
Demonstrate test method execution.
C3.4
Custom method edits or modifications:
Adding or deleting hardware or software channels
Adding or deleting TW4 calculations to a method
Deleting Inputs or Input Categories
Using new inputs in an existing calculation
Modifying an existing calculation
Adding or deleting a Configuration Item in
Define
Modifying or creating new Report or Export
Templates
Adding/inserting or deleting new or existing test
segments
Modifying the Data Collection tab of new or
existing test segments
C4.0 On-site Computer Integration (purchased option)
Item Description
Performed
On Site
C4.1
Load customer supplied drivers for USB2 interface
hardware.
C4.2
Install MTS supplied multi-channel hardware in PC if
purchased. (Purchased Option)
C4.3
Install TestWorks software.
C4.4
Define and/or load system hardware parameters.
C4.5
Verify computer interface with MTS controller.