Draining the reservoir to an external location, Draining the reservoir to an external location 44, Draining the reservoir – MTS Model 286-20 Confining Pressure Intensifier User Manual

Page 44: To an external location, Procedure, Draining the reservoir to an external container, 20 pressure intensifier, Operating procedures operation, 2 - b

Advertising
background image

286.20 Pressure Intensifier

44

Operating Procedures

Operation

Draining the Reservoir to an External Location

Procedure:

1. Connect a hose between the connector on the lower side of the Fluid

Direction valve (rear side of control panel) and the external fluid container.

2. Set the Fluid Direction valve to position B. Confining fluid in the fluid

reservoir will flow into the container by means of gravity.

Triaxial

Cell

Open

Close

Confining Fluid Input

Open

Close

Confining Fluid Output

Open

Close

Reservoir Fill

Fluid

Reservoir

Open

Close

Intensifier Fill

Pressure

Intensifier

Low Pressure

Relief

Pressure

Transducer

Low pressure line

High pressure line

286.20

Confining

Pressure

Intensifier

r

Fluid Filter

Off

Fluid Transfer Pump Control

Air supply in

100 psi max.

Air Driven

Hydraulic

Pump

Fluid Direction

A

B

C

C

A

B

Empty

Reservoir

From fluid

supply or to

empty fluid

Fill system from

fluid supply

using pump

Fill system

from reservoir

using pump

Confining

Pressure

A

B

A

B

Air Direction

Air supply into empty

traxial cell.

Bleed air into reservoir

when filling triaxial cell.

psi

bar

High Pressure

Relief

Air Pressure

Relief

Draining the Reservoir To An External Container

2 - B

Advertising