22 • 35-3000RK-10 PPM Hexane Sample Draw Detector

7.

Connect the humidifier tube from the gas collection bag to the inlet line.

Allow the sample draw pump to draw out any residual gas in the gas collection bag.

8.

Close the tubing clamp.

NOTE:

This step will cause a low flow alarm.

9.

Disconnect the humidifier tube from the inlet line.

10. Connect the humidifier tube from the gas collection bag to the dispensing valve, then

open the clamp.

11. Turn the dispensing valve’s on/off knob counterclockwise to open it. The gas

collection bag begins to fill.

12. Turn the dispensing valve’s on/off knob clockwise to close it when the gas collection

bag appears full.

13. Close the clamp, then disconnect the humidifier tube from the regulator.

14. Open the clamp, then connect the humidifier tube from the gas collection bag to the

sample draw detector’s inlet line.

15. Allow the sample draw detector to draw sample for one minute.

16. Measure the voltage between the B terminal on the detector terminal strip and the -

(negative) terminal on the controller terminal strip as shown below in Figure 5.

Figure 5: Load Voltage Measurement

17. Adjust the load voltage adjust pot until the load voltage is 4.0 V ± 0.1 V.

18. Allow the sample draw detector to draw out any residual gas in the gas collection

bag.

19. Disconnect the humidifier tube from the sample draw detector’s inlet line.

20. If necessary, remove the short inlet line used for this adjustment and re-install the inlet

line.

21. Unscrew the dispensing valve from the calibration cylinder.

Controller Terminal Strip

Load Voltage Pot

Detector Terminal Strip

NOTE: Detector and Controller

Wires Not Shown

W

B

R

DETECTOR

1-2 Hex
3-4 H2

Gas Select

1

3
4

2

+

PWR / SIG

S

SPAN

ZERO

Measure Load Voltage
Between B and -

Digital

Voltmeter

Advertising