RKI Instruments 65-2400RK-05 User Manual

Page 12

Advertising
background image

Combustilbe Gas Transmitter • 12

9.

Secure the junction box cover to the junction box.

Replacing the amplifier

1.

Turn off incomming power.

2.

Remove the junction box cover.

3.

Disconnect the detector leads from the interconnect terminal strip and the controller
wires from the interconnect terminal strip.

4.

Unscrew and remove the two screws that secure the amplifier to the junction box.
The screws are at the top left and bottom right of the amplifier.

5.

Remove the amplifier.

6.

Place the new amplifier in the same position as the amplifier you removed in the
previous step.

7.

Use the two screws you removed in step 4 to secure the amplifier to the junction box.

8.

Reconnect the wiring from the controller to the interconnect terminal strip as shown
in Table 3 and Figure 3.

9.

Reconnect the detector leads to the interconnect terminal strip as shown in Table 4 and
Figure 3.

10. Turn on incomming power.

CAUTION:

Allow the detector to warm up for 15 minutes before you continue with the next step.

11. Calibrate the combustible gas transmitter as described in the Calibration section of

this insert.

Table 3: Reconnecting the Combustible Gas Amplifier to a Controller

Amplifier

Interconnect Terminal Strip

Controller Terminals

GND

24 V -

4-20

4-20 mA (Feedback)

24V

24 V +

Table 4: Reconnecting the Combustible Gas Detector to the Amplifier

Detector Lead

Amplifier

Interconnect Terminal Strip

Red

SENSOR RED

White

SENSOR WHT

Green

SENSOR GRN

Black

SENSOR BLK

Advertising