Schwank premierSchwank IQ User Manual

Page 25

Advertising
background image

25

STS-JZ-F / IQ-F I&O Manual

IM101220

RD: AUGUST 2014

RL: 18A

SPECIAL COUPLER INSTALLATION

1. Install first tube so that the welded seam

along the tube length is in the lower half of
the tube facing downward

2. Slide the loosened tube coupler on to the

first tube, past the swage

3. The second tube is supplied with a ¼” hole

in the tube at the female end.

4. Slide second tube over swaged end of first

tube so that ¼” hole is located 90° up from
the bottom (3 or 9 o’clock position)

5. Note that the spine of the turbulator should

be oriented in a vertical position

6. Through the existing ¼” hole , drill a ¼”

hole through the wall of the first tube

7. Insert ¼” rivet into the hole

8. Slide coupler into position – half onto each

tube – covering the rivet head

9. Tighten coupler bolts to 40 ft-lb

10. Install reflectors

9.1 SPECIAL TUBE CONNECTION: 100,000 Btuh x 20 ft ONLY

NOTE: The connection of 1ST & 2ND tubes of the 100,000 x 20 ft heater experiences

strong forces of expansion. Follow instructions below for special coupling of the tubes and
orientation of the turbulator in the 2nd tube..

FIGURE 15 SPECIAL COUPLING:



100,000 x 20 ft

- Fasten Second Tube to First Tube -

Steps 2

thru 6

Step 7

Steps 8

& 9

1/4” Rivet

VIEW INSIDE TUBE: Ensure the 8 ft (2.4 m) tur-
bulator installed in the second tube is oriented
with its spine in a vertical position, and located at
the vent end of the tube.
This will result in the best performance and radi-
ant output from the system.

Step 5

NOTE:

100,000 Btuh x 20 ft Heater

TURBULATOR ORIENTATION

with 8 ft turbulator

2 ft

Install tube with turbula-
tor spine in vertical posi-
tion for best performance

Step 1

Welded seam in lower

half of tube, facing

downward

TOOLS REQUIRED:

 Electric Drill

 1/4” Drill Bit (supplied)

Advertising
This manual is related to the following products: