Schwank premierSchwank IQ User Manual

Page 28

Advertising
background image

28

STS-JZ-F / IQ-F I&O Manual
IM101220
RD: AUGUST 2014
RL: 18A

NOTE: All hangers must be installed with the cavity side facing the burner end of the system -

Except the vent end hanger - the hanger cavity side at vent end of the must face the vent.

FIGURE 19 REFLECTOR EXTENSIONS (OPTIONAL - IF REQUIRED )

1. Reflector extensions may be installed on

one side or both sides of the reflector

2. Reflector extensions are 116” (295 cm)

long

3. Holes (3) for “S” hooks are located

2.25” (5.7 cm) from each end and one at
the center of the reflector extension

4. Drill 1/4” (7 mm) holes in the reflector

3/4” (2 cm) up from the bottom edge of
the reflector to align with the 3 holes in
the top of the reflector extension

Reflector extensions
may be installed one
or both sides

Insert ‘S’ hook

from top and

rotate

10”

25 cm

5. Insert “S” hook down through hole in the top of the reflector extension

6. Rotate “S” hook approx. 90°, and insert into hole in reflector

7. Settle reflector extension into place

Advertising
This manual is related to the following products: