Schwank duraSchwank - Steel STW-JZ User Manual

Page 24

Advertising
background image

24

SPW-JZ, STW-JZ / IWP, IW

I&O Manual IM101229

RL: 12B- BA

RD: AUG 2013

NG or LP

110,000 x 50

not required

-

NG or LP

130,000 x 30

14' (4.3 m)

VENT END - FACTORY INSTALLED IN TUBE

NG or LP

130,000 x 40

10' (3 m)

VENT END - FACTORY INSTALLED IN TUBE

NG or LP

130,000 x 50

not required

-

NG or LP

2' (0.6 m)

FIELD INSTALLED AT END 3RD TUBE

+ 10' (3 m)

VENT END - FACTORY INSTALLED IN TUBE

NG or LP

150,000 x 50 *

2’ (0.6 m)

FIELD INSTALLED AT VENT END

NG or LP

150,000 x 60

not required

-

NG or LP

175,000 x 50/60

10’ (3 m)

VENT END - FACTORY INSTALLED IN TUBE

NG Only

175,000 x 70

10’ (3 m)

VENT END - FACTORY INSTALLED IN TUBE

NG Only

200,000 x 50

10’ (3 m)

VENT END - FACTORY INSTALLED IN TUBE

NG or LP

200,000 x 60/70

10’ (3 m)

6th tube = 50 TO 60 ft

150,000 x 40 *

GAS
TYPE

MODEL
Input x Length (ft)

TURBULATOR
LENGTH

TURBULATOR LOCATION
IN TUBE SYSTEM

NG or LP

45,000 x 20

14' (4.3 m)

VENT END - FACTORY INSTALLED IN TUBE

NG or LP

60,000 x 20

14' (4.3 m)

VENT END - FACTORY INSTALLED IN TUBE

NG or LP

60,000 x 30

14' (4.3 m)

VENT END - FACTORY INSTALLED IN TUBE

NG or LP

80,000 x 20

14' (4.3 m)

VENT END - FACTORY INSTALLED IN TUBE

NG or LP

80,000 x 30

14' (4.3 m)

VENT END - FACTORY INSTALLED IN TUBE

NG or LP

80,000 x 40

10’ (3 m)

VENT END - FACTORY INSTALLED IN TUBE

NG or LP

110,000 x 30

14' (4.3 m)

VENT END - FACTORY INSTALLED IN TUBE

NG or LP

110,000 x 40

10' (3 m)

VENT END - FACTORY INSTALLED IN TUBE

NOTE: Improper location of a turbulator can cause malfunction of the heater,
property damage, and will void the heater warranty.

Tube Kits are supplied with 4 ft & 10 ft turbulator(s) factory installed into the
tube(s). Tubes with turbulators are clearly labeled for easy identification. Two
models require that a 2 ft turbulator be installed in the field (see * below).

TURBULATOR LENGTH & LOCATION IN SYSTEM:

* 155 Models (150,000 Btuh): 2 ft turbulator is supplied in the Burner Kit and is field installed:



40 ft heater: Insert in end of third tube, prior to the 10 ft turbulator that is factory installed
in the last tube (total 12 ft turbulator)



50 ft heater: Insert in the vent end of the last tube in the system.

Advertising
This manual is related to the following products: