Warning, Commissioning report, As per i&o manual and local codes – Schwank duraSchwank - Steel STW-JZ User Manual

Page 43

Advertising
background image

43

SPW-JZ, STW-JZ / IWP, IW

I&O Manual IM101229

RL: 12B- BA

RD: AUG 2013

24. START-UP / COMMISSIONING SHEET

COMMISSIONING REPORT

CONTRACTOR NAME: ................................................................................DATE................................

ADDRESS:............................................................................................................................................

............................................................................................................................................................

CITY:........................................................................................

PHONE:...................................................................................

CELL: .....................................................................................

JOB SITE......................................................................................................CITY................................

HEATER MODEL NUMBER:.................................................................................

HEATER SERIAL NUMBER: ................................................................................

AS PER I&O MANUAL AND LOCAL CODES

THIS EQUIPMENT HAS BEEN FACTORY FIRED AND TESTED PRIOR TO
SHIPMENT. HOWEVER, THIS APPLIANCE IS NOT “PLUG & PLAY”. IT RE-
QUIRES COMMISSIONING AND FIELD ADJUSTMENT / SPECIFICATIONS
CONFIRMATION TO ENSURE SAFE AND EFFICIENT OPERATION.

TO ENSURE THAT SITE CONDITIONS ARE COMPATIBLE WITH THE HEATER’S PER-
FORMANCE AND TO ALLEVIATE NUISANCE CALL-BACKS, THE FOLLOWING START-
UP NEEDS TO BE COMPLETED BY THE QUALIFIED GAS INSTALLER.

A TECHNICIAN CALLING FOR TECHNICAL SUPPORT MUST PROVIDE THE

INFORMATION FROM THE COMPLETED COMMISSIONING REPORT ON

THE NEXT PAGE

FAX COMPLETED REPORT TO TECHNICAL SERVICES:

FAX 1-866-361-0523,

VOICE 1-877-446-3727

WARNING

START UP ‘SMOKE’

During start up, material coatings used in the production process of tubes and reflectors will
“burn off” and create smoke during the first hour of operation. This is temporary and normal.

Please ensure that there is sufficient ventilation to adequately clear the smoke from the space.

Notify site and safety personnel to ensure that alarm systems are not unduly activated.

Located on burner rating plate

Located on burner rating plate

Advertising
This manual is related to the following products: