Schwank duraSchwank - Steel STW-JZ User Manual
Page 31
31
SPW-JZ, STW-JZ / IWP, IW
I&O Manual IM101229
RL: 12B- BA
RD: AUG 2013
11A. Combined System Length: Tube Heater + Vent + Combustion Air Duct
:
MINIMUM VENT LENGTH: (Vented or Unvented)
Minimum vent length of 3 ft (91 cm) is required (
NOTE: 200,000 LP: Minimum 8 ft (244 cm)
MAXIMUM SYSTEM LENGTH (includes:
Tube Heater length + combustion air duct + vent):
Each 90° elbow in the system has an equivalent length of 5 ft.
A maximum of 2 elbows are allowed in any portion (duct, tube heater, vent) with the ex-
ception of up to three 90° elbows in a vertical vent run through the roof
The maximum length of combustion air duct to any heater is not to exceed 30 feet
Exceeding the allowable lengths in the table below can create combustion and/or conden-
sation problems and will void CSA Design Certification and the heater warranty.
V
ERTICAL
VENT
THROUGH
THE
ROOF
:
It is the sole responsibility of the installer to
adhere to all current local codes and/or ANSI
Z223.1 / CSA.B149.1 latest editions for all
venting requirements, and practices.
Use an approved ‘B-vent’ termination cap
as supplied by the manufacturer of the ap-
proved ‘B-vent’.
When vent and combustion air are taken
through the roof, the exhaust vent should
always terminate higher than the combus-
tion air intake, to prevent recycling the
products of combustion back into the
heater
At most a quantity of three 90° elbows can be installed in a vertical vent
Approved
Cap
A p p r o v e d
‘B’ Vent
24”
60 cm
12
9
If roof slope exceeds 9:12
consult NFPA-54 ANSI
Z223.1 or CSA-B149.1
FIGURE 22
Up
to
Input
(Btuh)
Max. Combined
System Length*
Do Not Exceed
Max. Vent
Length*
Max. Air Duct
Length*
45,000
60 ft
Up to 30 ft
Up to 20 ft
60,000
60 ft
Up to 30 ft
Up to 30 ft
80,000
80 ft
Up to 40 ft
Up to 30 ft
110,000
100 ft
Up to 40 ft
Up to 30 ft
130,000
100 ft
Up to 40 ft
Up to 30 ft
150,000
100 ft
Up to 40 ft
Up to 30 ft
175,000
120 ft
Up to 50 ft
Up to 30 ft
200,000
120 ft
Up to 50 ft
Up to 30 ft
* Do not exceed the Maximum Combined System Length regardless of the allowed maximum
length of individual vent or combustion air duct
Example
150,000 Btuh Heater:
Tube Heater Length 50 ft
1 x 90° elbow (vent) 5 ft
Straight vent
20 ft
1 x 90° elbow (duct) 5 ft
Air Duct
17 ft
Combined Length
97 ft
Max. Allowed
100 ft