Schwank duraSchwank - Steel STW-JZ User Manual

Page 25

Advertising
background image

25

SPW-JZ, STW-JZ / IWP, IW

I&O Manual IM101229

RL: 12B- BA

RD: AUG 2013

SPECIAL COUPLER INSTALLATION

1. Note the 2 holes opposite each other at the swaged end of the first tube (flanged)

2. Install the first tube with 2 holes (swaged end) at the 3 and 9 o’clock position, with the welded

seam located in the lower half of tube, facing downward

3. Slide the loosened tube coupler on to the first tube, past the swage

4. The second tube has a

¼

” hole at the female end.

5. Slide second tube over swaged end of first tube to align the hole in the second tube with one of

the holes in the first tube

6. Final alignment of the holes can be accomplished using a screw driver or other tool

7. IMPORTANT: Insert

¼

” rivet into the hole to secure the tube connection

8. Slide coupler into position – half onto each tube – covering the rivet head

9. Tighten coupler bolts to 40 ft-lb

10. Install reflectors

9.1 SPECIAL COUPLING: 175,000 & 200,000 Btuh

NOTE: The joint of 1ST & 2ND tubes of 175,000 & 200,000 heaters experience strong

forces of expansion. Follow instructions below for special coupling of the tubes.

FIGURE 16 SPECIAL COUPLING:



175,000 & 200,000 Btuh - Fasten Second Tube to First Tube -

Steps 3 to 6

Step 7

Steps 8 & 9

1/4” Rivet

Welded seam in lower half of tube,
facing downward

Holes in swage of 1st tube:
locate at 3 and 9 o’clock

Steps 1
& 2

Advertising
This manual is related to the following products: