Schwank supremeSchwank IO-210 User Manual

Page 17

Advertising
background image

2300 / IO 210 Manual

IM110107

RD: MAY 2014

R.L. 15A

17

Indication of back firing:



Loud ignition noise, followed by distinct hissing sound.



Little or no visible burning on the ceramic tile surface.



Combustion is taking place inside the burner body.

WARNING: If heater backfires during operation, it must be turned off immediately.

Cause & remedy of back firing:



Improper gas pressure entering the venturi tube: check pressure.



Breakage of a ceramic tile and or gasketing: - replace damaged part.



Faulty sealing of the ceramic tile to the burner body, caused by breakdown of gasket ma-
terial: contact your local distributor or contractor.

HEATER SERVICING POSITION:

WHEN USING WALL MOUNT BRACKET JP-2300-MB (see Figure 4 next page), the heater
may need to be rotated ‘up’ so that access is provided to the service access door at the rear
side of the heater that is against the wall.

1. To allow rotation of the heater, slacken the upper bolt fastening the heater bracket to the

wall mounting bracket .

2. Remove the lower bolt securing the two brackets and rotate the heater up to the service

position.

3. Insert the bolt in the upper bracket hole to hold the heater for servicing, and apply locking

nut to bolt for extra safety. Heater panel can now be accessed and serviced safely.

4. NOTE: Do not start up the heater when in this upper service position as the gas

valve is in a compromised position. Before starting the heater, ALWAYS restore the
heater bracket back to its original plane and correct support position.

5. To restore the heater to the operating position, lift and support the weight of the heater and

remove nut and bolt from upper hole.

6. Slowly rotate the heater back down to the correct operating position.

7. Insert and fasten the bolt in the bottom hole, and secure with the nut.

8. At completion of service, ensure that both bracket support bolts are tightened securely.

Servicing of heater is essential for continued efficient operation. Servicing should be carried
out annually by a qualified gas service technician as follows:



Clean the ceramic tiles with compressed air. Avoid directing air stream at gasket material
between tile and heater body. The air pressure must be lower than 20 psig.



Clean venturi tube with compressed air. The air pressure must be lower than 20 psig.



Ensure gas orifice is clean and the heater cabinet is free of any debris

12. SERVICING GUIDE (Also refer to Troubleshooting Guide on page 29)

Advertising
This manual is related to the following products: