Page 3

4. PRE-INSTALLATION SURVEY

The Schwank SEB /SEBU heating system
must have gas piping of the correct diameter,
length, and arrangement to function properly.
For this reason, a layout drawing is

necessary.
Carefully survey area to be heated, and for
best results, whenever possible, place burner
and combustion chamber in coldest area.

5. MOUNTING CLEARANCES

TABLE 2: RECOMMENDED HEATER PLACEMENT


MODEL

MOUNTING

HEIGHTS

(FEET)

MAXIMUM

DISTANCE

BETWEEN

HEATERS

(FEET)

DISTANCE-OUTSIDE WALL

TO HEATER LONG AXIS

PARALLEL TO WALL (FEET)

HORIZONTAL

ANGLE

SEB/U 200

18 – 25

50

17 – 25

SEB/U 175

18 – 25

50

17 – 25

SEB/U 155

16 – 21

45

15 – 20

SEB/U 130

15 – 21

40

15 – 20

SEB/U 110

13 – 19

35

13 – 18

SEB/U 80

10 – 16

30

12 – 16

SEB/U 60

8 – 14

25

11 – 15



COMBUSTIBLE

CLEARANCE

IMPORTANT: Continuous operation of single or multi-heater placement must
not cause any combustible material in storage to reach a
temperature in excess of 160

O

F.

This heater must be mounted and positioned
to maintain the minimum clearance to com-
bustible materials as shown in FIGURE 1
(PAGE 4) TABLE 3 (PAGE 4). For recom-
mended heater placement refer to TABLE 2
(below). Heaters should also be located and
installed with respect to building construction

and equipment to provide a minimum clear-
ance of 24 inches from the end of burner
housing for servicing and cleaning of burner,
blower and controls. A minimum horizontal
clearance of 4 ft. from electrical meters, gas
meters, regulators and relief equipment is re-
quired by ANSI Z223.1.& CSA B149.1-00.