Burner & tube kit assembly chart, Ser & ir, Residential garage/workshop heaters – Schwank SER(IR) User Manual

Page 6: Models

Advertising
background image

GP-MSER-BX-11A

SER / IR Manual

RD: March 2006

RL: 11A

KH

Page 2

3. PRE-INSTALLATION SURVEY

The SER / IR heating system must have gas piping of correct diameter, length, and arrange-
ment to function properly. For this reason, a layout drawing is necessary. Carefully survey area
to be heated. For best results, whenever possible, place burner and combustion chamber in cold-
est area.

2. INSTALLATION IN GARAGES

SER / IR Series tube heaters are approved for use in garages. The installation must conform to
local building codes or, in the absence of local codes, to the standard NFPA No. 54 (ANSI
Z223.1 latest edition), in the U.S.A. and the CSA B149.1-00, and CAN1.2.16-M81 in Canada.
In a garage installation, the minimum clearance from the bottom of an infra-red heater to the
upper surface of a vehicle shall not be less than the certified clearance to combustible material
as indicated on the heater.

**"SU" Tube Kit includes a JS-0513-CU Turn Box, packed and

shipped in a separate carton.

Stand-Alone Tube Kits require no additional tube kits.
Primary Tube Kits require at least one additional Secondary Tube Kit.
Secondary Tube Kits require a Primary Tube Kit.
Secondary Tube Kit TM-1010-SX can also be used as a 10 ft extension kit. The installer

may

need to remove the turbulator (refer to Turbulator Chart in the I&O Manual).

4. MOUNTING CLEARANCES

SER / IR Series tube heaters must be mounted with minimum clearances between
the reflector surface and combustibles as shown in FIGURE 1, TABLE 2 (page 3).

For recommended heater placement refer to TABLE 3 (page 3). Heaters should also be lo-
cated in relation to building construction and equipment, to allowing a minimum clearance of
16 inches from end of burner housing to enable servicing and cleaning of burner, blower and
controls.

BURNER & TUBE KIT ASSEMBLY CHART

MODELS:

SER

& IR

:

Residential Garage/Workshop Heaters

TM-

TM-

TM-

TM-

TM-

4510-

4520-

1420-

1430-

1410-

SX

SX

SX

SX

SU**

10'

1

20'

1

20'

1

30'

1

10' U

1

TUBE KIT PART # & QUANTITY REQUIRED

60,000

Stand-Alone Kits Only

45,000

BURNER KIT

FIRING RATE

Advertising