Schwank STSp-CANADA User Manual

Page 15

Advertising
background image

SP-MSTP-AC-15A

STS-p Manual

RD: DEC, 2003

RL:15

KH

Page 11

TABLE 4

MODEL

TURBULATOR LENGTH

(IF REQUIRED)

STS-p 200-70/60/50

10’

STS-p 175-70/60/50

10’

STS-p 155-60

not required

STS-p 155-50

not required

STS-p 155-40

10'

STS-p 130-50

not required

STS-p 130-40

10'

STS-p 130-30

14'

STS-p 110-50

not required

MODEL

TURBULATOR LENGTH

(IF REQUIRED)

STS-p 110-30

14'

STS-p 80-40

10’

STS-p 80-30

14'

STS-p 80-20

14'

STS-p 60-30

14’

STS-p 60-20

14'

STS-p 45-20

5’

STS-p 45-10

5’

STS-p 110-40

10'

Where required the STS-p Series Heaters will be supplied with the turbulators, factory
installed into the end tube(s) of the system configuration.

NOTE:

FIGURE 12 PLATE HANGER/ELBOW INSTALLATION

5 90

0

(shown) or 180

0

Elbow

6 Tube Coupler
7 Point at which Swaged tube is fully
inserted into elbow and Swaged end of
elbow is fully inserted into tube.

1 End-Plate-Hangers
2 Focus Shield Reflectors
3 End-Plate-Hanger Flange OVER

Reflector

4 End Plate Hanger Flange UNDER

Reflector

1

2

2

3

3

4

4

5

6

7

Advertising