SP-MSTP-AC-15A

STS-p Manual

RD: DEC, 2003

RL:15

KH

Page 4

5. PRE-INSTALLATION SURVEY
The Schwank STS-p heating system must
have gas piping of the correct diameter,
length, and arrangement to function properly.
For this reason, a layout drawing is
necessary.

Carefully survey area to be heated, and for
best results, whenever possible, place burner
and combustion chamber in coldest area.

6. MOUNTING CLEARANCES

This heater must be mounted with at least
minimum clearances between the reflector
surface and combustibles as shown in
FIGURE 1, TABLE 3, ON PAGE 5.

For recommended heater placement refer to
TABLE 2 (below).

Heaters should also be located and installed
to provide a minimum clearance of 24 inches
from the end of the burner housing to allow
for servicing and cleaning of burner, blower
and controls.

TABLE 2 RECOMMENDED HEATER PLACEMENT

MODEL

MOUNTING

HEIGHTS

“FEET”

MAXIMUM

DISTANCE

BETWEEN

HEATERS “FEET”

DISTANCE – OUTSIDE WALL

TO HEATER LONG AXIS

PARALLEL TO WALL IN “FEET”

HORIZONTAL ANGLE

STS-p 200

18 – 25

50

17 – 25







COMBUSTIBLE
CLEARANCE

STS-p 175

18 – 25

50

17 – 25

STS-p 155

16 – 21

45

15 – 20

STS-p 130

15 – 21

40

15 – 20

STS-p 110

13 – 19

35

13 – 18

STS-p 80

10 – 16

30

12 – 16

STS-p 60

8 – 14

25

11 – 15

STS-p 45

6 – 10

20

8 – 12

Single or multi-heater placement must be such that continuous
operation of heater(s) will not cause combustible material or

materials in storage to reach a temperature in excess of 160

O

F.