Page 6 – Schwank SCH-200 Construction User Manual

Page 10

Advertising
background image

SP-MCH2-BX-07A

SCH-200 MANUAL

R.D: Sept 2004

RL: 7

KH

Clearing Burner Screen:

- Make sure gas supply is off

- Use compressed air If air is not available on the site, aerosol can is available: Part # JH-0930-XX

- Insert air nozzle through the pilot lighting hole at side of mantle base

- Direct at flame retaining screen, and blow out any accumulated dust

- Re-open gas supply

- Re-light pilot, and continue using the construction heater as before.

Replace filter at least:

- once every 2 weeks

- minimum once a day when sanding drywall

- each time when connecting heater at different location

* Clean burner screen with each filter change;
( see next window )


Filter replacement:

- Shut off gas supply

- Grasp filter retainer and pull together at retainer grips

- Free filter retainer

- Remove and discard filter

- Replace with a new filter

- Reinstall filter retainer, complete with filter

FILTER RETAINER

FILTER

Page 6

Advertising