SDC Z7200 CYLINDRICAL LOCK User Manual
Page 2

P:\INSTALLATION INST\ELECTRIFIED LOCKSET\Z7200\INST-Z7200.vsd REV G 04-13 Page 2
5. REMOVE INSIDE TRIM
3. INSTALL LATCH
4. INSTALL STRIKE
a. Insert latch in hole and keep it parallel to door face.
Mark outline and remove latch
b. Chisel 1/8” (3mm) deep or until faceplate is flush with
door edge.
c. Insert latch and tighten screws.
NOTE: LATCH BOLT BEVEL MUST FACE TOWARDS
CLOSING DIRECTION.
a. Close door to mark horizontal line of strike.
b. Measure one half of door thickness from
door stop to mark vertical center line of strike.
Drill 1" (25.4mm) hole, 1/2” (12.7mm) deep at
intersection of horizontal and vertical center lines.
c. Cut out jamb 3/32” (2.4mm) deep or until strike
is flush with jamb. Tighten screws securely.
c
a
b
a
b
CENTER
LINE
1" (25.4mm) hole
1/2” (12.7mm) deep
c
Use lever catch tool to depress lever
catch, visible under hole of inside lever
shank and slide off inside lever, rose
liner and mounting plate.
INSIDE LEVER
INSIDE ROSE
LINER
LEVER CATCH
TOOL
OUTSIDE LEVER
ASSEMBLY
INSIDE MOUNTING
PLATE
ROSE