Domes, Part 1: installation instructions – USG Domed Ceilings and Barrel Vaults User Manual
Page 3

Page of 12
Part 1:
Installation
Instructions
Domes
Tip:
It may be easier to mark hanger locations on a tape measure or a long stick and use this as a template
against the ceiling. If there are many obstructions, it may be easier to mark the locations on strips of tape along
the floor
(Figure 4),
then use a laser to project the points to the ceiling.
Tip:
Extra hanger holes are provided to help work around obstructions; however, the space between any two
hanger wires must not exceed 2 (every fourth hole).
Eight rows of hanger wires radiate from the center of the dome. As these rows diverge by more than 4,
additional rows of hanger wires need to be inserted between them
(Figure 4)
.
Figure 4 – Hanger wire locations from floor
strips of tape
applied to floor
B
4˚
22
1
/
2
˚
hanger wire
locations for
primary spokes
secondary spokes must
be inserted between
primary spokes where
this dimension exceeds 48"
hanger wire
locations for
secondary
spokes