Rockwell Automation 20P PowerFlex DC Drive - Frame B Field Dual Diode Module User Manual
Page 13
 
PowerFlex® DC Drive - Frame B Field Dual Diode Module
13
Step 5: Install the Field 
Board and New Field Dual 
Diode Module
Install the Field board and new Field Dual Diode module in reverse order of 
removal as detailed in Step 4: 
Remove the Field Board and Existing Field
.
•
Apply thermal grease to the bottom of the Field Dual Diode module 
before securing it to the heatsink.
•
Tightening torque for the screws connecting the Field Dual Diode 
module to the heatsink and the screws connecting the Field board to the 
Field SCR and Dual Diode modules is 2.5…4.0 N•m (22…35 lb•in).
Step 6: Install the Pulse 
Transformer and Switching 
Power Supply Boards
Install the Pulse Transformer and Switching Power Supply boards in reverse 
order of removal as detailed in Step 3: 
Remove the Pulse Transformer and
Switching Power Supply Boards on page 5
.
•
Verify that the four plastic board stabilizers mounted on the top air flow 
plate are placed one on either side of each of the Pulse Transformer and 
Switching Power Supply boards. 
ATTENTION: Thermal grease must be applied to the bottom 
of the Field Dual Diode module before securing it to the heatsink 
or damage to the drive may occur.
ATTENTION: Each gate lead cable must be connected to the 
exact connector from which it was removed on the Pulse 
Transformer circuit board or damage to the drive may occur.
One plastic stabilizer should be on either side of each board
Air flow plate
Plastic 
stabilizers
Top view of Pulse Transformer board
Side cut-away view
Pulse Transformer board
Switching Power Supply board