Output power and devicenet cables – Rockwell Automation 1792D-8BVT8D ArmorBlock MaXum 8 Input/8 Output Module Series B User Manual

Page 7

Advertising
background image

ArmorBlock MaXum 8 Input / 8 Output Module Series B 7

Publication 1792D-IN020B-EN-P - September 2000

I/O connectors for this module are shown below.

Output Power and DeviceNet Cables

Output power and DeviceNet cables are described in the installation
publications for the cable base assembly of your choice. Refer to the
following publications:

• 1792D-IN009B-EN-P ArmorBlock MaXum Cable Base

Installation Guide

• DN-6.7.2 DeviceNet Cable Planning and Installation Manual

ATTENTION

!

• Make sure all connectors and caps are

securely tightened to properly seal the
connections against leaks and maintain IP67
requirements.

• For maximum noise immunity, input and

output cable return wires must be properly
terminated. When inputs and outputs are
connected in loopback, return wires should
be connected together.

• I/O cable length should be less than 30

meters.

41517

Input 0
Input 1

Input 2
Input 3

Input 4
Input 5

Input 6
Input 7

Output 0
Output 1

Output 2
Output 3

Output 4
Output 5

Output 6
Output 7

Connector A

Connector B

Connector C

Connector D

Connector E

Connector F

Connector G

Connector H

Advertising